Champion Wind Farm

logoIn March 2008, E.ON began commercial operation of the 55 Siemens 2.3 megawatt turbines which make up the 126.5 MW of installed capacity at the Champion Wind Farm. Each turbine stands 415 feet tall from the ground to the top of the blades. Since turbines do not use water, the farmers in Nolan County, where this project is located, welcomed the arrival of this complimentary land use into their fields.

 

logoChampion:

  • Operational Date: March 2008
  • Turbines: Siemens Mark II 2.3 MW Turbines
  • Nameplate Capacity: 126.5 MW
  • Other Land Uses: Cotton and wheat farming