header
spacer
spacer

Pioneer Trail Wind Farm

logoLocated in Iroquois and Ford counties, Pioneer Trail is E.ON’s second project in the MISO market and in Illinois. Pioneer Trail’s 94 General Electric 1.6 MW turbines bring 150.4 MW of renewable generation to the Land of Lincoln. This wind farm can power more than 45,000 homes.

 

logo
Pioneer Trail:

  • Operational Date: Winter 2011
  • Turbines: 94 General Electric 1.6 MW Turbines
  • Nameplate Capacity: 150.4 MW
  • Other land uses: Corn and Soybean Farming
spacer

 

home page